Novotec Engineers have extensive experience for
all phases of the Project of any size and complexity
and different countries so they can be easily integrated
into the employer’s multi-discipline team.
Novotec Engineers are currently providing expertise
in work supervision for EDF-HC main contractor of
NT2 Project.
Summary of Nam Theun 2 Project
Installed capacity: 1070 MW
21 Construction sites
- 2 Dams
- 13 saddle dams
- 1 water intake
- 1 network of tunnels and shafts
- 35 kms of channels
- 180 km of high voltage transmission lines
- 140 kms of roads
- 10 bridges
Organization of the Construction
CIVIL WORKS PACKAGES
The Civil Works have been divided into three packages:
CW1
- Upstream works including RCC dam (150 000 m3), spillway (87 000 m3 CC) and radial gates (size 5 x 8 x 11.15), rim bunds, headrace channel.
- Roads rehabilitation and new works + bridges
- Operator’s village at Gnommalath.
CW2
- Intake structure and gates
- Underground works including low pressure tunnel (1000m, diam.8 m), shaft (300m, diam. 8 m), high pressure tunnel and steel lining (1000m, diam 7 m), manifold.
- Power Station platform, civil works (630 000 m3 rxcavation, 56 000 m3 CC) and operating offices.
- 115 kV and 500 kV switchyard platforms.
CW3
- Tairace pond excavation (1 800 000 m3 excavation).
- Regulating pond, weir (including 50 000 m3) roller compacted concrete and gates.
- Downstream channel (6 800 000 m3 excavation) including a 710 m tunnel
ELECTRICAL & MECHANICAL PACKAGES
Equipment to be supplied, installed and commissioned was divided into two packages:
EM1
Power station generating units including:
- 4 Francis generating units:
The Francis generating units are generating units with 350m net head and 247 MW each, including spherical valve, speed governor, exitation system and 13 (one spare) associated 500 kV one phase step-up transformers. - 2 Pelton generating units:
The Pelton generating units are generating units with 350m net head and 43 MW each, including spherical valve, speed governor, exitation system and 2 associated 115 kV three phase step-up transformers. - Power Station Mechanical auxiliaries:
Cooling, compressed air, ventilation and air conditioning, oil treatment, handling equipment- 500/115/22 kV substation equipment including exchange transformers.
- 115/22 kV substation equipment at Thakhek including exchange transformer.
- SCADA system and protection equipment
- Telecommunications
- Workshop equipment and service facilities
EM2
- 500 kV double circuit transmission line (130 km) between Nam Theun 2 power station and Savannakhet (including Mekong crossing)
- 115 kV single circuit transmission line (70 km) between Nam Theun 2 power station and Thakhet.
print